New concrete base foundations were laid and services brought to the building.
The new timber framed building uses three vaulted steel trusses with stainless steel tension bars to give a vaulted ceiling effect. The building exterior is finished in coloured fibre cement cladding boards with a wood effect shiplap finish. The roof used a new hot felted roof covering.
Inside, the two new learning areas feature sound absorbing/suppressing ceilings under the vaulted areas and climate controlled air conditioning.